Canada-North Fraser Pretrial Centre

Address:
   Port Coquitlam, BC
Client:
North Fraser Pretrial Centre
Type:
Justice + Public Safety

This new 330-bed facility was based on a new combined direct / indirect supervision podular operational model that maximized staffing efficiencies, minimized response times, and improved inmate supervision, while reducing capital and operating costs. Safety and security are optimized with a greatly reduced reliance on electronic surveillance. Inmate access to programs, recreation and visits is practically unlimited without increasing the demand on staffing. Inmate movement beyond the living unit is virtually eliminated.
The project was completed at $2.5 million under budget while saving more than $13 million per year in operating and capital amortization costs.


Ce nouvel établissement de 330 lits est basé sur un nouveau modèle opérationnel de surveillance directe et indirecte combinée, qui maximise l'efficacité du personnel, minimise les temps de réponse et améliore la surveillance des détenus, tout en réduisant les coûts d'investissement et d'exploitation. La sûreté et la sécurité sont optimisées grâce à la réduction considérable du recours à la surveillance électronique. L'accès des détenus aux programmes, aux loisirs et aux visites est pratiquement illimité sans augmenter la demande en personnel. Les déplacements des détenus en dehors de l'unité d'habitation sont pratiquement éliminés.
 Le projet a été achevé avec un budget inférieur de 2,5 millions de dollars, tout en permettant d'économiser plus de 13 millions de dollars par an en frais d'exploitation et d'amortissement du capital.